- To oversee the activities of the State Technical Agencies (STAs) in the region and advise/ assist in resolving issues that may arise at the time of the scrutiny of Project Proposals of the States.
- To carry out random checks of the Proposals scrutinized by STAs.
- To organize Orientation / Refresher Programmes to the STA Personnel for Proper Scrutiny of Project Proposals.
- To identify the type of strengthening required for the Laboratories in the Districts (PIUs) and also at STAs.
- To advise Project Implementing Units (PIUs) on any region specific issues that will have a bearing on the Design, Construction and Performance of Rural Roads.
- To design and manage Regional Training Programmes for the Engineers of PIUs and Contractors by developing course material for different training modules and acting as Resource persons/ Institutions.
- To manage Regional Quality Control System and assist NRRDA with the analysis of Quality Monitoring Reports of State Quality Monitors (SQMs) and National Quality Monitors (NQMs). It will also help in identifying and resolving the issues arising out of Quality Monitoring System.
- To evaluate specifications, practices and the use of locally available materials for making the proposals Cost Effective.
- To formulate design specifications for new and innovative technologies.
- To study the gaps in the existing practices in Rural Roads Construction and to identify areas for R&D. The PTA also assists NRRDA in processing the R&D Proposals and entrusting the same to reputed organization
- About Us
- PMGSY Guidelines
-
Documents +
- Operations Manual
- Grameen Sampark
- Core Network
- Accounting & Audit Manuals
- Standard Bidding Document
- World Bank
- Model Bidding Document - World Bank
- Asian Development Bank
- Quality Assurance Handbook For Rural Roads Volume-I
- Office Manual
- Quality Assurance Handbook for Rural Roads Volume-II
- Human Resource Policy
- Handbook on Maintenance of Rural Roads In India
- Budgets
- Maintenance of Rural Roads: Guidance Note for States
- Annual Action Plan
- Procurement And Contract Management Manual
- Internship Scheme of NRIDA
- Technical Documents
- Advertisements / Circulars
-
International Conference
-
International Conference Documents
- Booklets
- Presentations
- International Conference Website
- Brochure
-
International Conference Documents
-
Maintenance
- eMARG
- Rural Roads Maintenance Policies Of States
- Brochures on Rural Roads Maintenance
- Training Modules on Rural Roads Maintenance
- Impact Assessment Study of Improved Rural Roads Maintenance
- Strengthening the Capacity of Panchayati Raj Institutions - Managing Maintenance of Rural Roads
-
Quality
- Empanelment of NQM's under PMGSY
- Guidelines on Quality Assurance and Control Mechanism
- Guidelines on action to be taken on the Reports of the NQMs
- Guidelines for Performance Evaluation of NQM
- NQM Inspection format- Maintenance works
- NQM Guidelines and Format
- Check List for Visit of Area Officers
- NQM Inspection Report Format
- De-empanelment of National Quality Monitors
- List of NQM’s
- List of SQC’s
- List of NQM Emeritus
-
Training / Meeting
-
iGot Presentations
-
1. Advanced Programme - Planning, Design _ Construction of Long Span Bridges- (Batch I) - 22
- 1.Prof M R Madav -Advanced Concepts in the Geotechnical
- 2.Prof M R Madav- Considerations in Design of BridgesN
- 3. Shri Arvind kumar jaiswal - Seismic Effects on Perofrmance of Long Span Bridges (1)
- 4.Shri S Sai Baba-Sustainable design of long span bridges
- 5. Shri P G Venkat Ram- Bridge Construction methods and the failures associated with them
- 6. Sri P G Venkat Ram - Quality control measures that can prevent Bridge failures
- 7. Shri S Sai Baba - Innovative launching
-
2. CONSTRUCTION AND QUALITY CONTROL OF FLEXIBLE AND RIGID PAVEMENTS
- L01-CSRK_PMGSY_T2022P3_QA_QC_20220303
- L02-Construction and Quality control of Subgrade and Granular layers
- L03-PMGSY_QC_SS_03032022
- L04-GRK_Testing Cement _ Cement Concrete
- L05-PMGSY Soil properties
- L06-PMGSY_SS_Roughness_04032022
- L07-VR
- L08_VC_LTUB_4MAR2022_1
- L09-VR
- L10-PMGSY_NDT_SS_05032022
- L11_VC_LTMB_5MAR2022 New
- L12_VC_MMBMD_5MAR2022
- 3. GIS Curriculum for PMGSY
-
4. New Technologies used in PMGSY Roads
- FDR
- Lecture 0 Introduction of New Technologies
- Lecture 1- White topping, Short Panel Concrete Pavements and Cell filled concrete pavements
- Lecture 2 - Roller compacted concrete pavements and Interlocking concrete block pavements
- Lecture 3- Utilization of waste plastic in Low volume Roads
- Lecture 4-Stabilization Methods for Low Volume Roads
- Lecture 5- Mord Specification for Low Volume Road
- Lecture 6- Design of Flexible Pavements for LVR Reinforced with Geosynthetics
- Lecture 7- Surface Dressing
- Lecture 8-Use of Geosynthetics in Low Volume Roads
- Lecture 9- USE OF MARGINAL MATERIALS IN LOW VOLUME ROADS
- 5. Pavement Design Construction and Maintenance
- 6. Preparation of DPR
- 7. Procurement of Services
- 8. Road Safety Audit
-
1. Advanced Programme - Planning, Design _ Construction of Long Span Bridges- (Batch I) - 22
- Training Programmes
- Training Modules
- Training Institutions
- List of Trained Engineers & Contractor/ Staff
- Schedule of Training
- Workshops & Seminars
- Suggested Faculties
- Login For Participation
- List of Certified Road Safety Auditors
- Meeting
-
iGot Presentations
- Resource Center
- Media
- External Links