Profile of Selected Roads in Aizwal

Three roads constructed under PMGSY in the district were selected for assessment of socio-economic impact on the lives of the habitations connected through them.

2.1A Road No.1 – Rulchawn to Mualpheng Road

Name of Road Construction of Rulchawn to Mualpheng Road
Package No. MZ 0110
Length 8 Kms
Contractor LALMUANPUIA, VENGHLUI,AIZAWL
Block THINGSULTHLIAH
Circle EASTERN CIRCLE
Division SAITUAL DIVISION
Tender Cost 197.56 Lakh
Amt. Cleared by GOI 197.56 Lakh
Date of Completion 31-3-2003
Habitations Covered Population Category
Mualpheng 1000 ST
Rulchawn 1100 ST
Profile of the Study Areas

PMGSY Road starting from Rulchawn to Mualpheng

This 8 Kilometers long PMGSY Road from Rulchawn to Mualpheng village connects Mualpheng village to the district's main road.

The district road which further connects to Saitual and Aizawl. The road provides connectivity to markets, administration offices and educational institutions. Prior to the construction of this Road no motorized road was available from Mualpheng village to the Division and District Headquarters.

2.1B Road No. 2 -Maubuang, Phulpui, Tachhip Approach Road

Name of Road CONSTRUCTION OF MAUBUANG, PHULPUI, TACHHIP APPROACH ROAD
Package No. MZ 0112
Length 12.15 Kms.
Contractor T.C. LALZARLIANA
Block AIBAWK
Circle WESTERN CIRCLE
Division HWUIFANG
Tender Cost 209.16 Lakh
Amt. Cleared by GOI 209.16 Lakh
Habitations Covered Population Category
Tachhip 900 ST
Sateek 870 ST

In the year 2001-2002 MAUBUANG, PHULPUI, TACHHIP, PMGSY Road was sanctioned, but it has divided into 3 small projects, which is connecting three different habitations to major district road (World Bank funded).

Profile of the Study Areas

1. Tachhip Approach Road - B.T. completed

Length 3 Kms.
Date of Starting  Feb 2002
Date of Completion Jan 2003
Profile of the Study Areas

2. Phulpui Approach Road - 75% of work is completed

Length 5.65 K.M
Date of Starting  Feb 2002
Profile of the Study Areas

3. Maubuang Approach Road - Formation cutting is completed

Length 3.5 Kms.
Date of Starting Feb 2002
Date of Completion Dec 2002

The road falls under Aibawk Development Block.

This road further connects to Block Headquarters, which is at a distance at 3 Kms. and further to the district headquarters to Aizawl. The connectivity through this road provides easier access to markets in Aizawl.

2.1C Road No.3 - Saitual to Sihfa

Name of Road SAITUAL TO SIHFA
Package No. MZ 0111
Length 4.3 Kms.
Contractor R. LALHNUNA, REPUBLIC VENG, AIZAWL
Block PHULLEN
Circle EASTERN CIRCLE
Division SAITUAL DIVISION
Tender Cost 120.22 Lakh
Amt. Cleared by GOI 120.22 Lakh
Date of Starting of Works 8-2-2002
Date of Completion 31-3-2003
Habitations Covered Population Category
Sihfa 1200 ST
Phullen (30 Kms.) 2000 ST
Profile of the Study Areas

PMGSY Road Starting from Saitual to Sihfa

This 4.3 Kilometers of PMGSY Road from Saitual to Sihfa was completed on 31-3-2003, this road connects Sihfa village to the district's main road. The road falls under Phullen Development Block and is aimed at providing connectivity to the markets at Aizawl.

Profile of Selected Roads in Champhai District

Three roads constructed under PMGSY in the district were selected for assessment of socio-economic impact on the lives of the habitations connected through them.

2.2A Road No.1 - Chawngtlai To Tualte

Name of Road CHAWNGTLAI TO TUALTE
Package No. MZ 0207(B)
Length 11 Kms.
Contractor LALRINTLUANGA SAILO, LUANGMUAL, AIZAWL
Block KHAWZAWL
Circle EASTERN CIRCLE
Division KHAWZAWL
Tender Cost 96.82 Lakh
Amt. Cleared by GOI 96.82 Lakh
Date of Completion 31-3-2003
Habitations Covered Population Category
Tualte 1200 ST
Chawngtlai (Starting Point) 1800 ST
Profile of the Study Areas

Road starting from Chawngtlai to Tualtepmgsy

In the year 2001-2002 11 Kms. long CHAWNGTLAI TO TUALTE PMGSY Road was sanctioned, formation cutting has been completed till Tualte village. Chawngtlai has been connected by another road to major district Road between Khawzawl to Champhai. The road falls under Khawzawl Development Block.

A significant change in the connectivity status is being brought by this road.

2.2B Road No.2 - Kawlkulh To Puilo Road

Name of Road KAWLKULH TO PUILO ROAD
Package No. MZ 0201
Length 5 Kms.
Contractor JOHNSON EASTERN POWER, KHATLA AIZAWL
Block KHAWZAWL
Circle EASTERN CIRCLE
Division KHAWZAWL
Tender Cost 152.15 Lakh
Amt. Cleared by GOI 152.15 Lakh
Date of Starting of Works 5-10-2001
Date of Completion 28-2-2003
Habitations Covered Population Category
Puilo 425 ST
Chhawrtui (leads to this place) 900 ST
Profile of the Study Areas

PMGSY Road Starting from Kawlkulh to Pulio

Kawlkulh to Puilo road was sanctioned and the works started on 5-10-2001 and the road was completed on 28-2-2003. This 5 Kilometers PMGSY Road from Kawlkulh to Puilo village connects this village to the to the district's main road, further another PMGSY roads has been made (only formation cutting) till Chhawrtui village.

2.2C Road No.3 - Hmunhmetha to North Khawburg

Name of Road HMUNHMETHA TO NORTH KHAWBURG (Phase I)
Package No. MZ 0205
Length 8.40 Kms.
Contractor ZORAMCHHAWA ELECTRIC, VENG, AIZAWL
Block KHAWZAWL
Circle EASTERN CIRCLE
Division NEC DIVISION, CHAMPHAI
Tender Cost 163.06 Lakh
Amt. Cleared by GOI 163.06 Lakh
Date of Starting of Works 5-10-2001
Date of Completion 28-2-2003
Habitations Covered Population Category
HMUNHMETHA 1200 ST
NORTH KHAWBURG 1000 ST
Profile of the Study Areas Profile of the Study Areas

PMGSY Road Starting from Hmunhmetha to North Khawburg

In the year 2000-2001 Champhai- Hmunhmetha PMGSY Road was sanctioned, formation cutting has been completed till Hmunhmetha. In the year 2001-2002 another PMGSY road from Hmunhmetha to North Khawburg was sanctioned (only formation cutting) and the it was completed on 28-2-2003.